On Fri, 2010-08-20 at 06:47 -0700, Peter Zijlstra wrote:
Updated patch appended. Thanks.
---
From: Suresh Siddha <suresh.b.siddha@intel.com>
Subject: sched: move sched_avg_update() to update_cpu_load()
Currently sched_avg_update() (which updates rt_avg stats in the rq) is getting
called from scale_rt_power() (in the load balance context) which doesn't take
rq->lock.
Fix it by moving the sched_avg_update() to more appropriate update_cpu_load()
where the CFS load gets updated aswell.
Signed-off-by: Suresh Siddha <suresh.b.siddha@intel.com>
---
kernel/sched.c | 6 ++++++
kernel/sched_fair.c | 2 --
2 files changed, 6 insertions(+), 2 deletions(-)
diff --git a/kernel/sched.c b/kernel/sched.c
index 41541d7..f95bbbe 100644
--- a/kernel/sched.c
+++ b/kernel/sched.c
@@ -1294,6 +1294,10 @@ static void resched_task(struct task_struct *p)
static void sched_rt_avg_update(struct rq *rq, u64 rt_delta)
{
}
+
+static void sched_avg_update(struct rq *rq)
+{
+}
#endif /* CONFIG_SMP */
#if BITS_PER_LONG == 32
@@ -3182,6 +3186,8 @@ static void update_cpu_load(struct rq *this_rq)
this_rq->cpu_load[i] = (old_load * (scale - 1) + new_load) >> i;
}
+
+ sched_avg_update(this_rq);
}
static void update_cpu_load_active(struct rq *this_rq)
diff --git a/kernel/sched_fair.c b/kernel/sched_fair.c
index 806d1b2..a2bf7bd 100644
--- a/kernel/sched_fair.c
+++ b/kernel/sched_fair.c
@@ -2268,8 +2268,6 @@ unsigned long scale_rt_power(int cpu)
struct rq *rq = cpu_rq(cpu);
u64 total, available;
- sched_avg_update(rq);
-
total = sched_avg_period() + (rq->clock - rq->age_stamp);
available = total - rq->rt_avg;
--