On Fri, 2008-10-24 at 22:15 -0700, David Miller wrote:
No. Those numbers are with TSO/GSO disabled.
I did a manual 100% sched and everything related revert to 26 scheduler,
and had ~the same result as these numbers. 27 with 100% revert actually
performed a bit _worse_ for me than 27 with it's overhead.. which
puzzles me greatly.
-Mike
--