I have another backup running right now, after building a plain
2.6.21-rc3, and rebooting just now for the test. I don't think its the
scheduler itself, but is something post 2.6.20 that is messing with tars
mind and making it think the files it just read to do the estimate phase,
are all new, so even a level 2 is in effect a level 0. I'll have an
answer in about an hour, but its also 2:36am here and I'm headed for the
rack to get some zzz's. So I'll report in the morning as to whether or
not this backup ran as it was supposed to. I have a feeling its not
going to though.
--
Cheers, Gene
"There are four boxes to be used in defense of liberty:
soap, ballot, jury, and ammo. Please use in that order."
-Ed Howdershelt (Author)
"When it comes to humility, I'm the greatest."
-- Bullwinkle Moose
-